Modular aluminium access ramp with handrails to both sides, viewed from the top landing, on a retail fitout in Rye.

Access, installed.

Access ramps, tactile indicators, stair nosings, handrails and thresholds, supplied and installed for commercial, institutional and government sites across Melbourne.

Innovate Access Group, Authorised Victorian Reseller and Installer of RampAssist Modular Access Ramps.

What is installed

  • Access ramps

    Modular aluminium systems, timber and composite, and threshold ramps. Supplied and installed to AS 1428.1.

  • Tactile indicators

    Integrated and discrete tactile ground surface indicators at stairs, ramps, kerbs and platforms, installed to AS/NZS 1428.4.1.

  • Stair nosings

    Slip-resistant nosings with luminance contrast, installed to AS 1428.1.

  • Handrails

    Handrails and extensions to AS 1428.1, including rectification of heights and extensions at handover.

  • Thresholds and transitions

    Level thresholds and junctions between floor finishes, resolved so the path of travel passes inspection.

Sectors

  • Education

    Universities, schools and campuses, scheduled around teaching.

  • Government

    State and local government buildings and public sites, documented for asset and compliance records.

  • Commercial construction and fitout

    Head contractors, fitout, retail and hospitality, cleared before practical completion.

  • Health and aged care

    Hospitals, clinics, aged care and retirement facilities, with minimal disruption to operating sites.

  • Residential

    Homes, installed on referral from occupational therapists and funded through NDIS, aged care and other schemes.

How work is delivered

  1. Scope. From drawings, a defects list, an access consultant's report or a site inspection.
  2. Supply. Product sourced to specification. Modular ramp systems are manufactured to order.
  3. Installation. By qualified tradespeople, to the relevant Australian Standard and the National Construction Code, on operating sites and live construction programs.
  4. Documentation and handover. Product data, installation detail and photographs supplied for the building surveyor, access consultant or asset register. Certification and sign-off remain with the surveyor.

Installation carries a 24 month workmanship guarantee.

Credentials

  • Qualified trades
  • $20m public liability
  • Workers compensation
  • Police checked and Working with Children checked personnel
  • Construction induction trained

Projects

Retail fitout, Rye

Internal 4.4 m modular aluminium access ramp with handrails to both sides, supplied and installed for a head contractor on a live pharmacy fitout. Installed to AS 1428.1.

Modular aluminium access ramp with handrails to both sides, viewed from the bottom of the run, on a retail fitout in Rye.

Enquiries

Send drawings, a defects list or a description of the site. Enquiries are answered within one business day.